
Vessel
8
Automatic Pressure Build-up Control System
(Option)
Item
Description
1 Pressure build-up line
2 Pressure build-up valve
3 Pressure build-up control valve
The automatic pressure build-up valve controls the pressure
in the vessel.
It is recommended with continuous withdrawal operation.
Close the pressure build-up valve (2) prior to filling,
relieving pressure or transporting.
Pressure Build-up Control
• Switch on by opening the pressure build-up valve (2),
Position A.
• Switch off by closing the pressure build-up valve (2),
Position B.
Changing the Operating Pressure
• Turning the regulating screw of the pressure build-up valve
in clockwise direction causes the pressure to increase.
• Turning the regulating screw of the pressure build-up valve
in counter clockwise direction causes the pressure to
decrease.
Automatic Pressure Build-up Control Valve Mode of
Operation:
• The pressure build-up control valve (3) will open when the
pressure in the tank drops.
• The liquid nitrogen is introduced into the pressure build-up
line (1) at the vessel bottom, it evaporates and is returned
to the tank.
• The pressure in the tank rises to the adjusted operating
pressure.
• The pressure build-up control valve (3) closes.
2.11 Pressure Build-up Control
System
Comentários a estes Manuais